Skip to main content

JCS Proposed Main Modifications

The Joint Core Strategy (JCS) has now reached 'Main Modifications' stage.  These are changes to the 'Pre-Submission' (June 2014) version of the JCS that have been discussed at the hearings with the Inspector and have been considered and agreed by each of the three JCS Councils.

The Proposed Main Modifications were published for consultation between 27th February and 10th April 2017.

A schedule of all the proposed Main Modifications is available to download below.  The schedule clearly identified the section or paragraph of the document to which the proposed main modifications relates and has been provided with a unique reference number.  Deleted text is shown as struckthrough and new text is shown in bold italics (also shown in red on the Table of Proposed Main Modifications).  In addition, the relevant changes are reflected on the maps / plans included in the documents.

Full details of responses will be made available on this page in due course.

This consultation has now closed.

Timeline

  • Opened
    27 Feb 2017 at 17:00
  • Closed
    10 Apr 2017 at 23:59
  • Response Published
    10 May 2017

Documents

  • JCS Proposed Main Modifications
    Click on this version of the JCS Main Modifications to make comments online. You can read review the full schedule of proposed changes and make responses by individual Main Modification. Each comment box allows 50,000 characters and you can also upload additional documents to support it. You can save your responses and come back to it later and at the end, download your comments for future reference. A help function is also available in the system, but if you have any specific questions please do not hesitate to contact a member of the JCS Team - details above.
  • Table of Proposed Main Modifications
    This document provides a table of all of the Proposed Main Modifications to the JCS Pre-Submission document from June 2014.
  • Modified and new maps
    This document shows all modified and new maps representing the Proposed Main Modifications.
  • Deposit Locations
    Provides a list of all locations where hard copies of the consultations documents, supporting information and response forms have been made.
  • Proposed Main Modifications - Tracked changes to Pre-Submission (June 2014)
    For reference purposes only, this document shows the Proposed Main Modifications as tracked changes to the JCS Pre-Submission document.

Details

Contact Details

Joint Core Strategy Team
Municipal Offices
Promenade
Cheltenham
Gloucestershire
GL50 9SA

Email: info@gct-jcs.org

Telephone:

Gloucester: 01452 396396
Cheltenham: 01242 264328
Tewkesbury: 01684 295010 


Powered by INOVEM Consult™ - Online Consultation Software